Author Archives: admin

Operation Smile – charity event

Bubbles-Beauties-PRINT-2

GALA – Friends of the Museums of Mississauga

Friends of Mississauga Museums Gala

Friends of Mississauga Museums Gala

Rattray Marsh Conservation Activities

Please open attachment

 

rattray2015_final_2

MP Stella Ambler’s Community Skate Party

You’re Invited to MP Stella Ambler’s Community Skate Party

Join your Member of Parliament for an afternoon of Free Family Fun!

Please bring a non-perishable food item to donate to the Compass Food Bank

Also, visit the Canadian Blood Services on-site booth to learn ‘What’s Your Type?’

Monday, February 16, 2015 from 11:00 a.m. to 1:00 p.m.

Port Credit Arena, 40 Stavebank Road, Mississauga

Warm Refreshments will be served.

RSVP (905) 278-4111 or by email to stella.ambler.c1@parl.gc.ca

SPACE IS LIMITED – CALL SOON!

 

Filming TV series “Hemlock Grove”

Please note that a film crew will be filming interior and exterior scenes for the TV series “Hemlock Grove” on January 27, 6:00am until January 28, 2:00am at 1287 Birchview Drive (Ward 2).

 

A permit has been issued to allow parking on the following:

–         Both sides of Birchview Drive

–         North side of Aldo Drive (Between Birchview Dr and the road bend)

 

A permit has also been issued to allow camera equipment on the boulevard, sidewalk and roadway as two-way traffic is maintained at all times and to allow maximum 3-minute traffic stoppages under the supervision of Peel Regional Police not between the hours of 7:00 – 9:00am and 4:00 – 6:00pm.

 

Affected residents have been informed of these activities via notification letter. In accordance with the filming policy, signatures from more than 80% of the affected residents have been obtained in order to allow:

–         Overnight parking

–         Afterhours vehicle movement

–         Afterhours filming

 

Should you have comments, questions or concerns please contact Liza Toliao at the Film Office at 905-615-3200 x4114.

 

 

Hydro Corridor re-design

The City is currently reviewing the dimensions of the trail with the Design Team and is recommending that the new width of the trail be reduced from 4.5m down to 3.5m. It is also being looked at to keep, wherever possible, the existing desire lines that have already been worn in by residents. This will allow for a separation between those who want to use the pathway to walk their pets or have a leisurely stroll, while not impeding those who want to use the trail.

The Design Team has also been in contact with Peel Health in order to form a partnership in the development of this trail.

We are still anticipating that construction will be commencing in Spring 2015.

For more information on this project, please click here

 

http://www.mississauga.ca/portal/residents/hydrocorridortrail

Maple Magic

190631_maplemagic_poster_d4

WATER INTERUPTION

Dear Customer:

 

The Region of Peel Public Works department regularly maintains and repairs the water

system to make sure you have a reliable supply of quality drinking water. Sometimes we

must turn off your water supply while we do the work. In the next few days, we will be

working in your area and will have to turn off your water for a few hours.

 

Your water will be turned off on Wednesday, January 21, 2015 from approximately 11:00 a.m. to 3:00 p.m. However, if the weather is bad or if a problem arises, we will reschedule the work and will let you know the new date and time.

 

When we turn the water back on, air in the pipes may make the water cloudy and your

plumbing may vibrate or make noise. If this happens, you can remove the air by briefly

turning on your taps from the lowest to the highest faucet in the building (that is, starting

in the basement/first floor, and finishing on the top floor). Flush the toilets as well.

 

You should only have to run the water for 10 to 30 seconds, but keep running it until the

water is clear and any vibration or noise has stopped.

 

If your water meter starts to leak, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

Yours truly,

Shaun Hussain

Foreman, Construction Inspection

Engineering Technical Services

Operations Support

Public Works Department

2 Copper Road, Brampton ON, L6T 4W5

(905) 791–7800 Ext. 3309

 

C: Karen Ras – Regional Councillor – Ward 2

INTERRUPTION DETAILS

Date and Time:         Wednesday, January 21, 2015 from 11:00 a.m. to 3:00 p.m.       

 

Location:                    1494 Elite Road

                                   

Houses Affected:

                                    #1446, 1454, 1464, 1474, 1484, 1502, 1512, 1520, 1530, 1540,

1577, 1569, 1559, 1549, 1539, 1529, 1519, 1511, 1501, 1493,

1483, 1473, 1463, 1453, 1445

 

#1526 and 1523 Winslow Road

 

#1524 Wembury Road

                                                                                                           

                                    Mississauga

 

Project #:                   C-479760

 

Project Manager:      Jay Christy

 

Telephone #              905-791-7800 ext. 7875

Road Construction Notice – Lakeshore Road West in Clarkson

Road Construction Notice – Lakeshore Road West in Clarkson

Vandyk Craftsman has entered into an Agreement with the City of Mississauga and the Regional Municipality of Peel to develop the lands adjacent to the Birchwood Park in Clarkson Village.

There will be construction activity commencing January 12, 2015 on Lakeshore Road West for the required watermain relocation and storm box culvert crossing for the development.

As a necessity, the west bound lanes will be closed for six weeks from Johnson’s Lane to Meadow Wood Road, with west bound traffic being moved into the northerly east bound lane. Traffic will be restricted to one lane in each direction during this six week period.

For further information please contact:

Ms. Donna Waters
Supervisor, Development Construction
City of Mississauga
Transportation and Works Department
905-615-3200 ext. 3240
donna.waters@mississauga.ca

Electrical System Rebuild

November 12, 2014

 

Dear Resident:

 

RE:    Electrical System Rebuild and Open House for Bramsey Drive, Camelford Road, Elite Road, Merrow Road, Randor Drive, Truscott Drive, Wedmore Way, Wembury Road and Winslow Road

 

Enersource Hydro Mississauga would like to inform you that we are making investments in the electrical infrastructure in your area.

 

A rebuild of electrical distribution system is scheduled to begin December 2014 and will last approximately 4 months. Work will consist of replacing and possibly relocating the following: old, decaying poles with new concrete poles, power lines, transformers and associated hardware. To meet current Electrical Safety Authority and Canadian Standards Association requirements, it may be necessary to add new poles and associated hardware to locations where none currently exist.
We would also like to advise you that tree trimming will be required on trees that are near our electrical equipment.  Trees will be pruned to ensure that a minimum 3 year growth clearance and safe distance is maintained from the main power lines.  Dead, defective and structurally weak branches may also require removal.  If you have any concerns, we are happy to speak with you in advance of this work taking place.                                                                                 .

It is our intention to carry out this work with as little inconvenience to you as possible. However, during this period of construction, there may be some road access limitations while crews are working.  Occasional power interruptions will also be required as crews transfer hydro lines.  Notification of any planned power interruptions will be delivered to you in advance.                 .

For more information on how this rebuild will affect you, please attend our upcoming Open House.  Details are as follows:


Wednesday, November 26, 2014
Benares Historic House – Visitor Centre
1507 Clarkson Road
6:30 pm – 8:00 pm
(Drop-in any time)

If you have any questions before the Open House or during the course of this job, please contact Craig Bourgeois, Overhead Maintenance Supervisor at 905-283-4114.

Sincerely,

 

Joanne Campea

Manager, Customer Outreach

Corporate Relations

 

C:        Councillor Pat Mullin, Ward 2
Councillor-Elect, Karen Ras, Ward 2